Stena have multiple crisis's ongoing at present , but seem to be pulling out of them , latest word on the two newbuilds is that a deal has been done with the liquidators of the bankrupt shipyard and Stena which will see the half finished ships completed , the HSS's fate was sealed long before the economic downturn when it emerged that the HSS's burn more fuel than 6 convensional ferries the size of Stena Adventurer combined.